Berlin:Depot feed New construction 670 V BRGBT Berlin-Rummelsburg
Disciplines
- Railways
Companies
GRE German Rail Engineering GmbH
Construction Sum
ca. 2,3 Mio €
Client
DB Fernverkehr AG
Duration
From 2020 to 2023Project Activities
Specialist planning 50 Hz systems Lph 1-2, 3, 5, 6, 7
Technical parameters:
- Technical equipment in the outdoor facilities
- Power installations
- 1000 V Electrical train preheating
- 670 V system
- Lighting system
- New construction of a transformer station
Contact
GRE German Rail Engineering GmbH
Frankfurt (Headquarters)
Hugo-Eckener-Ring
D-60549 Frankfurt am Main
Deutschland
Phone: +49 30 24749-0
E-Mail: info@gre-rail.com
Description
The ICE plant Berlin Rummelsburg 2 is currently being fundamentally rebuilt as part of the expansion project. The existing multiple unit hall is being extended by 200 metres. The hall infrastructure in the existing hall was adapted to today's standards and upgraded for the future handling of the ICE 4.
As part of the inventory, the existing 670 V depot feed was also checked for ICE 4 suitability.
The existing hall in the ICE plant Berlin Rummelsburg 2 consists of two vehicle halls, which were built in different construction phases. BA 1 with tracks 555 and 554 was built in 1992. BA 2 with tracks 553, 552 and 551 was built in 2007. Both halls are connected to each other and form the existing ICE plant. Due to track renaming, the records list tracks 551, 552 and 553 with the old designation 543, 542 and 541.
The depot feeder operates with two outgoing bays. Field 1 supplies the first BA, field 2 the second BA. In order to keep the site operational, the landfill feed is to be renewed in two construction phases.
Depending on the variant, it must be investigated whether parallel operation of the new and the old plant is possible. These effects are to be presented accordingly in the analysis of the variants and in the decision document to be prepared.